2/4
/Transport & TfL/ London//3 min read

Over 2,000 flights cancelled after Nats software defect, CAA to review

Transport Secretary Heidi Alexander has ordered an independent review after a coding error halted departures at Heathrow, Gatwick and other UK airports on 8 September.

News London evidence indexOpen analysis ▾
66/100Evidence
80/100Reporting
30/100Hype

Trust 66: named Nats chief and Transport Secretary plus Nats report cited, but no independent outlets or figure sources.

Higher is stronger

Critic 80: clear impact, quotes, next steps, but article reads largely like a press release.

Higher is stronger

Hype 30: headline strong but body factual; mild emphasis without sensationalism.

Lower is better

ByNews London Desk
/London Edition/3 min read
ShareFacebookXWhatsApp
Over 2,000 flights cancelled after Nats software defect, CAA to review

On 8 September a software error in the system that automatically assigns identification codes to aircraft caused the cancellation of over 2,000 flights across the United Kingdom. The disruption affected passengers at Heathrow, Gatwick, Manchester and Stansted airports, among others. The National Air Traffic Services (Nats) released a preliminary report on the incident on 9 September.

What the fault involved

Read Next in News London3 min read
London rail commuters face up to 4.2% fare rise

London rail commuters face up to 4.2% fare rise

Regulated fares are set to increase next March, with no funding allocated to extend the current freeze beyond spring 2027.

Nats explained that the faulty code‑allocation software normally generates a unique identifier for each aircraft when a manual request is entered. The error prevented the system from assigning these identifiers, which are required for radar tracking of flights in the airspace. Martin Rolfe, chief executive of Nats, told the Standard that the problem was a software issue and not linked to any prior outage or radar incident.

"I have now received Nats’ report and, while I am pleased to see that the safety of passengers was protected, it’s clear we need to urgently understand why this issue was not discovered and fixed before it caused chaos,"

Heidi Alexander, Transport Secretary

Heidi Alexander, Transport Secretary, described the disruption as "completely unacceptable" and said the incident caused frustration for travellers, airlines and airports. She added that the government will ensure the aviation sector is resilient enough to meet future demand.

Related Borough Coverage3 min read
Selhurst Road closes for bridge replacement and City Thameslink shuts for escalator upgrade

Selhurst Road closes for bridge replacement and City Thameslink shuts for escalator upgrade

Selhurst Road (A213) will be blocked from 12 December 2026 to 10 January 2027 while Network Rail fits a new bridge, and City Thameslink will not operate from 17 May 2027 until late December 2027 for escalator replacement

Government response and next steps

Following the Nats report, Alexander tasked the Civil Aviation Authority (CAA) with conducting an independent review of the findings and of Nats' investment plans for system resilience. The CAA is required to publish its report within six months of the appointment, according to the Standard.

2,000+Flights cancelledResult of software defect on 8 September

Nats has faced renewed calls for leadership accountability after the incident. Rolfe apologised to affected travellers and to the aviation industry for the inconvenience caused. No evidence has emerged that military or civil operators contributed to the fault, as confirmed by Nats in its preliminary report.

Questions this report answers

+How many flights were cancelled because of the software defect?

More than 2,000 flights were cancelled on 8 September when the code‑allocation software failed. The cancellations affected several major UK airports and left hundreds of thousands of passengers stranded.

+Who is responsible for reviewing the incident?

Transport Secretary Heidi Alexander has asked the Civil Aviation Authority to carry out an independent review of the Nats report and the agency's future resilience plans. The CAA will produce its findings within six months.

+When will the review be published?

The Civil Aviation Authority is required to publish its independent review within six months of being tasked, as stated by the Transport Secretary in the Standard report.

News London Desk

This article was written at the News London news desk from the reporting of the outlets listed below it. Drafting is done by a language model under human editorial supervision — there is no reporter behind this byline, and we would rather say so than invent one.

How stories are produced and scoredWho runs News LondonCorrections

Daily edition

The London Ledger

A considered capital-wide edit delivered each morning.

More Coverage in Transport & TfL

London rail commuters face up to 4.2% fare rise
London

London rail commuters face up to 4.2% fare rise

3 min read
Selhurst Road closes for bridge replacement and City Thameslink shuts for escalator upgrade
London

Selhurst Road closes for bridge replacement and City Thameslink shuts for escalator upgrade

3 min read
Text reporting campaign leads to 83,000 crimes logged
London

Text reporting campaign leads to 83,000 crimes logged

3 min read
London ULEZ fines drop 13.9% to 1.68 million
London

London ULEZ fines drop 13.9% to 1.68 million

2 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Capital conditions

Weather in central London

Loading live conditions…

Nats software defect grounds flights | News London