2/4
/Property & Planning/ Westminster//5 min read

Charing Cross office block to gain 35,000 sq m retrofit

Bridgemont submits plans to Westminster Council for Grade A upgrade at 1 Embankment Place

News London evidence indexOpen analysis ▾
74/100Evidence
83/100Reporting
20/100Hype

Named sources and documents cited

Higher is stronger

Clear explanation and quotes

Higher is stronger

Measured language used

Lower is better

ByNews London Desk
/London Edition/5 min read
ShareFacebookXWhatsApp
Charing Cross office block to gain 35,000 sq m retrofit

A real estate firm has submitted plans to refurbish the office block above Charing Cross Station. The application, filed by Bridgemont with Westminster City Council, proposes a retrofit of 1 Embankment Place to create 35,000 square metres of Grade A office space.

The building, designed by architect Sir Terry Farrell and completed in 1991, is currently occupied by PricewaterhouseCoopers. Planning documents describe it as outdated and struggling to attract new tenants.

Read Next in News London3 min read
Westminster man charged with rape after Covent Garden attack

Westminster man charged with rape after Covent Garden attack

Christopher Rocha, 22, of Kilburn Lane, appeared in Westminster Magistrates’ Court on 12 September and remains in custody pending a hearing at Wood Green Crown Court on 9 October.

Sustainable retrofit with street-level upgrades

Bridgemont’s plans would retain 90% of the existing structure and most of the façade. The scheme includes new rooftop pavilions on levels eight and ten, designed by Hopkins Architects.

At street level, the proposals aim to improve Villiers Street with new retail units, curved glazed facades, and better lighting. The design would remove the existing stone entablature to reveal and restore the original Victorian bridge structure beneath.

Related Borough Coverage3 min read
West Kensington regeneration to add 32,500 jobs and 4,400 homes

West Kensington regeneration to add 32,500 jobs and 4,400 homes

PriceHubble research, commissioned by SevenCapital, forecasts £11.8 billion of development across three sites from 2026 to 2030.

Planning documents state the changes would create an "urban galleria" intended to encourage pedestrians to linger. The upgrades are also meant to strengthen pedestrian links between the Embankment and the City.

This submission reflects what people told us mattered most throughout consultation, a more inviting Villiers Street, better pedestrian connectivity and a higher-quality ground floor experience.

Mark Wenlock, Principal at Bridgemont

Why the building needs refurbishment

Planning documents warn that without refurbishment, 1 Embankment Place risks becoming a "secondary building" or an "outdated asset". The documents describe a "flight to quality" among tenants, who increasingly favour modern, high-specification office space.

Bridgemont said the transformation is critical to secure the building’s future. The firm added that secondary buildings face growing challenges in attracting and retaining tenants, which can lead to a cycle of decline.

What happens next

Westminster City Council will now review the application. No date has been set for a decision. Residents and stakeholders can view the plans on the council’s public notice portal.

Questions this report answers

+How much office space will the refurbishment create?

The plans propose 35,000 square metres of Grade A office space. The retrofit would retain 90% of the existing structure while upgrading the building to modern standards.

+What changes are planned for Villiers Street?

The proposals include new retail units with curved glazed facades, improved lighting, and the removal of the existing stone entablature. The changes aim to create a more inviting pedestrian environment.

+Who is responsible for the refurbishment plans?

Bridgemont, a real estate firm, has submitted the application to Westminster City Council. The designs were created by Hopkins Architects.

+When will Westminster Council decide on the plans?

No decision date has been set. The application is now under review by Westminster City Council, and residents can view the details on the council’s public notice portal.

News London Desk

This article was written at the News London news desk from the reporting of the outlets listed below it. Drafting is done by a language model under human editorial supervision — there is no reporter behind this byline, and we would rather say so than invent one.

How stories are produced and scoredWho runs News LondonCorrections

Daily edition

The London Ledger

A considered capital-wide edit delivered each morning.

More Coverage in Property & Planning

Westminster man charged with rape after Covent Garden attack
Westminster

Westminster man charged with rape after Covent Garden attack

3 min read
West Kensington regeneration to add 32,500 jobs and 4,400 homes
Kensington & Chelsea

West Kensington regeneration to add 32,500 jobs and 4,400 homes

3 min read
Hackney Council lists 25 planning applications
Hackney

Hackney Council lists 25 planning applications

3 min read
London flats struggle to sell as market slumps
London

London flats struggle to sell as market slumps

4 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Capital conditions

Weather in central London

Loading live conditions…

35,000 sq m retrofit planned for 1 Embankment Place, Charing Cross | News London