2/4
/Transport & TfL/ City of London//3 min read

New DLR trains return to service on Stratford‑Woolwich route

TfL has fixed braking software, completed testing and will start phased re‑introduction of the air‑conditioned fleet

News London evidence indexOpen analysis ▾
70/100Evidence
70/100Reporting
45/100Hype

Reporting is corroborated by two independent outlets and cites named TfL officials and documents.

Higher is stronger

Both articles clearly separate fact from comment and provide specific details about the DLR train issue.

Higher is stronger

Headlines use mild emphasis, but the articles provide balanced reporting on the DLR train situation.

Lower is better

ByNews London Desk
/London Edition/3 min read
ShareFacebookXWhatsApp
New DLR trains return to service on Stratford‑Woolwich route

Transport for London announced on 29 July 2026 that the first of its 54 brand‑new DLR trains is operating again on the Stratford International to Woolwich Arsenal line. The train had been out of use since November 2025 after engineers identified a braking‑software error that could cause overshoot in wet conditions. Residents of east and south London will now see the air‑conditioned, wheelchair‑friendly units return to regular service.

Why the trains were withdrawn

Read Next in News London3 min read
TfL staff incurred £30,000 in parking fines and road charges

TfL staff incurred £30,000 in parking fines and road charges

Figures revealed by a Freedom of Information request show significant spending on infringements and other expenses.

The fleet was taken off the network as a precaution when an automated unit overshot a platform during wet weather, according to TfL. The incident was traced to a fault in the braking software that struggled when rail adhesion was low. TfL and the manufacturer, CAF, removed all 54 units while the problem was investigated.

Modifications and testing completed

TfL says engineers have altered the braking system and added equipment to improve wheel‑track grip. A comprehensive testing programme covering a range of operating conditions was then carried out. Stuart Harvey, TfL’s chief capital officer, told the BBC that the modifications are finished and the trains have passed all safety checks.

Related Borough Coverage3 min read
City of London keeps Sunday parking free after church petition

City of London keeps Sunday parking free after church petition

A report to the Planning and Transportation Committee will keep Sunday parking unchanged while proposing modest weekday tariff adjustments.

I apologise for the delay in reintroducing the trains but am pleased this marks an important milestone in delivering a modern new fleet for the DLR.

Stuart Harvey, TfL chief capital officer

Phased re‑introduction plan

TfL will begin adding the refurbished units to the timetable on the Stratford International to Woolwich Arsenal corridor. Additional trains will be introduced gradually, with performance monitored closely. The Mayor of London, Sadiq Khan, said the rollout will improve comfort and capacity for commuters in the Royal Docks and the Isle of Dogs.

54New DLR trainsAll equipped with air‑conditioning, live travel information and charging points

Questions this report answers

+Why were the new DLR trains taken out of service?

The trains were withdrawn in November 2025 after an automated unit overshot a platform in wet weather. Engineers linked the incident to a braking‑software fault that performed poorly when rail adhesion was low, prompting a precautionary fleet removal.

+What changes have been made to the trains before they returned?

TfL modified the braking software and installed equipment to increase wheel‑track grip. After the changes, a comprehensive testing programme in varied conditions confirmed the trains meet safety standards, allowing them to re‑enter passenger service.

+When will the new DLR trains start running for passengers?

The first refurbished train began service on 29 July 2026 on the Stratford International to Woolwich Arsenal route. TfL will add further units gradually, monitoring performance as the phased rollout proceeds along that line.

+How many new DLR trains are there in total?

TfL ordered 54 new DLR trains. All units feature air‑conditioning, live travel information, charging points and enhanced accessibility. The fleet will replace the oldest DLR stock as each train is introduced through the controlled rollout.

News London Desk

This article was written at the News London news desk from the reporting of the outlets listed below it. Drafting is done by a language model under human editorial supervision — there is no reporter behind this byline, and we would rather say so than invent one.

How stories are produced and scoredWho runs News LondonCorrections

Daily edition

The London Ledger

A considered capital-wide edit delivered each morning.

More Coverage in Transport & TfL

TfL staff incurred £30,000 in parking fines and road charges
London

TfL staff incurred £30,000 in parking fines and road charges

3 min read
City of London keeps Sunday parking free after church petition
City of London

City of London keeps Sunday parking free after church petition

3 min read
Severe delays hit Northern, Victoria and Overground Weaver services
London

Severe delays hit Northern, Victoria and Overground Weaver services

4 min read
Women on London Tube face new risk from Meta glasses, campaigners warn
London

Women on London Tube face new risk from Meta glasses, campaigners warn

3 min read

Who else reported this

Our article above is written from the facts in these reports. Read the originals — every one is linked.

Capital conditions

Weather in central London

Loading live conditions…

DLR trains resume service on Stratford-Woolwich route | News London