Weather in central London
Loading live conditions…
Topic
5 stories, newest first.
Passengers on the c2c and Greater Anglia routes are facing longer journeys and potential delays as Network Rail addresses track issues caused by dried-out clay. Speed restrictions are in place until the ground recovers.
Rail passengers travelling between London and Essex will experience amended timetables and longer journeys due to hot weather drying out clay beneath tracks. Network Rail is implementing speed restrictions and temporary schedule changes to ensure safety and reliability on c2c and Greater Anglia services.
Charing Cross station is closed until 17 August while engineers replace every section of track between the terminus and Waterloo East. The work includes platform repairs, bridge repainting and new ventilation on the footbridge at Waterloo East, all coordinated during a single blockade.
A points failure near London Liverpool Street station caused cancellations on services to Cheshunt and Hertford East on 4 August. Network Rail confirmed the fault, while Greater Anglia advised passengers to check before travelling.
A footbridge at East Croydon station, closed since its 2013 construction, will open to the public in 2027. Croydon Council contributed £6 million to the project, which stalled due to planning omissions and safety standard updates. Work begins summer 2026.
Loading live conditions…