Weather in central London
Loading live conditions…
Topic
12 stories, newest first.
Storm Boelo caused significant travel disruption across London and the UK on 25 October 2026. A fallen tree near Stansted damaged overhead electric wires, halting Stansted Express services and prompting 'do not travel' warnings from National Rail.
Brickfields level crossing near Upminster has been closed since 30 September 2026 due to dangerous behaviour by children and teenagers. Network Rail will not reopen the crossing until all local school year groups have received safety presentations from Network Rail and British Transport Police.
Brickfields level crossing in Havering has been closed for an initial 21 days from September 30. Network Rail took the decision after footage showed children and teenagers playing dangerous games, including 'chicken' with oncoming trains.
Trains from London Euston faced major disruption, cancellations, and delays of up to an hour due to damage to overhead wires. Services operated by Avanti West Coast, CrossCountry, and London Northwestern Railway were affected, with disruption expected to continue until at least 4pm.
Network Rail and the British Transport Police report that trespass caused South Western Railway to lose 9,437 minutes of service in 2025/26. Drones are now being tested at Waterloo station and will be rolled out to three more sites to curb the problem.
An 11-year-old boy died at the Bourneview pedestrian level crossing near Kenley Station in January 2025. An inquest found the death was accidental but highlighted a lack of safety features at the crossing, which had been recommended for upgrades almost two years prior.
An inquest concluded that an 11-year-old boy, Jaiden Shehata, died after being struck by a train at a level crossing in Croydon, with his mobile phone distraction and the crossing's lack of warnings cited as causes.
Passengers on the c2c and Greater Anglia routes are facing longer journeys and potential delays as Network Rail addresses track issues caused by dried-out clay. Speed restrictions are in place until the ground recovers.
Rail passengers travelling between London and Essex will experience amended timetables and longer journeys due to hot weather drying out clay beneath tracks. Network Rail is implementing speed restrictions and temporary schedule changes to ensure safety and reliability on c2c and Greater Anglia services.
Charing Cross station is closed until 17 August while engineers replace every section of track between the terminus and Waterloo East. The work includes platform repairs, bridge repainting and new ventilation on the footbridge at Waterloo East, all coordinated during a single blockade.
A points failure near London Liverpool Street station caused cancellations on services to Cheshunt and Hertford East on 4 August. Network Rail confirmed the fault, while Greater Anglia advised passengers to check before travelling.
A footbridge at East Croydon station, closed since its 2013 construction, will open to the public in 2027. Croydon Council contributed £6 million to the project, which stalled due to planning omissions and safety standard updates. Work begins summer 2026.
Loading live conditions…