Weather in central London
Loading live conditions…
Subject
News London has published 6 stories involving Network Rail, from August 2026 to August 2026. Each one is scored for how well the original reporting stood up, and lists the reports it was written from.
Residents travelling from Barnet to central London over the August bank holiday weekend face rail disruption due to engineering work on the East Coast Main Line. National Rail has confirmed closures from 20:00 on 29 August until 08:00 on 31 August, with replacement buses and diversions in place.
Charing Cross station is closed until 17 August while engineers replace every section of track between the terminus and Waterloo East. The work includes platform repairs, bridge repainting and new ventilation on the footbridge at Waterloo East, all coordinated during a single blockade.
A points failure near London Liverpool Street station caused cancellations on services to Cheshunt and Hertford East on 4 August. Network Rail confirmed the fault, while Greater Anglia advised passengers to check before travelling.
A footbridge at East Croydon station, closed since its 2013 construction, will open to the public in 2027. Croydon Council contributed £6 million to the project, which stalled due to planning omissions and safety standard updates. Work begins summer 2026.
A fire near Waltham Cross railway tracks has blocked all trains between Broxbourne and London Liverpool Street or Stratford. Stansted Express passengers face journeys of up to two and a half hours. Ticket acceptance applies on TfL and bus services until 18:00.
Greater Anglia suspended all services from London Liverpool Street at 14:57 on 29 July after a grass fire near Lea Road, Waltham Abbey. Fourteen London Fire Brigade engines attended; trains to Stansted Airport, Cambridge North, Meridian Water and Hertford East were cancelled, delayed or diverted via Seven Sisters.
Loading live conditions…